Hi Harshal,
indeed, the Valid-to date in the routing is automatically set to 31.12.9999.
It cannot be set differently, nor modified.
It is anyway possible to control the routing validity via the Production Version, see table MKAL field BDATU.
I hope this could help.
Thanks and regards,
Flavio