Hi Ajay,
RA key: 000003 is already assigned to PCC and I assume configuration also done properly
We have confirmed the output at header level (final stage) but not operation level. Is it the reason for not calculating the WIP ?
Can you please let me know the formula for WIP at target cost ?
How system behaves at variance calculation of final confirmation ?
Thanks,
Naveen